In, March, 2025, Shanghai chidi trade has delivered CAT 320BL, 320CL, 320D2 excaavtors loading into 40HQ containers. Disassembling and loading a 20-ton excavator into a 40HQ container is a complex process that requires careful planning, proper tools, and adherence to safety protocols. Below is a detailed step-by-step guide to help you through the process:

Step 1: Preparation

  1. Check Container Specifications :

    • A 40HQ container has internal dimensions of approximately  12.03m (L) x 2.35m (W) x 2.69m (H) .

    • Ensure the container is clean, dry, and structurally sound.

  2. Gather Tools and Equipment :

    • Hydraulic jacks, lifting slings, and cranes.

    • Wrenches, sockets, and other disassembly tools.

    • Protective gear (gloves, helmets, safety boots).

    • Straps, chains, and tie-downs for securing the load.

  3. Review the Excavator Manual :

    • Refer to the manufacturer’s manual for disassembly instructions, weight distribution, and lifting points.

  4. Plan the Disassembly :

    • Identify which parts need to be removed (e.g., boom, arm, bucket, counterweight, tracks, etc.).

    • Ensure you have enough space and a flat, stable surface for disassembly.
      3 containers of 20-ton middle size excavators ship out in March 1


Step 2: Disassembly

  1. Remove the Bucket :

    • Detach the bucket from the arm using hydraulic pins or bolts.

    • Secure the bucket separately for loading.

  2. Detach the Boom and Arm :

    • Use a crane to support the boom and arm.

    • Remove the hydraulic hoses and disconnect the pins or bolts holding the boom and arm to the main body.

    • Carefully lower the boom and arm to the ground.

  3. Remove the Counterweight :

    • The counterweight is heavy and requires a crane for safe removal.

    • Detach it from the rear of the excavator and set it aside.

  4. Detach the Tracks (if applicable) :

    • If the excavator has tracks, remove them to reduce width and weight.

    • Use a hydraulic jack to lift the excavator and remove the tracks.

  5. Disconnect Hydraulic Lines and Electrical Connections :

    • Label and cap all hydraulic lines to prevent leaks.

    • Disconnect any electrical connections and secure them.
      3 containers of 20-ton middle size excavators ship out in March 2


Step 3: Loading into the Container

  1. Position the Container :

    • Place the container on a flat, stable surface near the disassembly area.

    • Ensure the container doors are fully open and secured.

  2. Load the Main Body :

    • Use a crane or forklift to lift the main body of the excavator.

    • Carefully position it inside the container, ensuring it is centered and balanced.

  3. Load the Boom, Arm, and Bucket :

    • Place the boom and arm alongside the main body, ensuring they are securely strapped.

    • Position the bucket in a way that maximizes space utilization.

  4. Load the Counterweight and Tracks :

    • Place the counterweight and tracks in the remaining space, ensuring they are secured to prevent movement during transit.

  5. Secure All Components :

    • Use heavy-duty straps, chains, and tie-downs to secure all parts inside the container.

    • Ensure there is no movement or shifting of components.
      3 containers of 20-ton middle size excavators ship out in March 3


Step 4: Final Checks

  1. Inspect the Load :

    • Double-check that all parts are securely fastened and there is no risk of movement.

    • Ensure the container doors can close properly.

  2. Seal the Container :

    • Close and seal the container doors.

    • Use a tamper-proof seal for security.

  3. Document the Process :

    • Take photos of the loaded container for insurance and documentation purposes.

    • Prepare a packing list detailing all components loaded.
      3 containers of 20-ton middle size excavators ship out in March 4


Safety Tips

  • Always use proper lifting equipment and follow safety guidelines.

  • Ensure all personnel involved are trained and wear appropriate protective gear.

  • Avoid overloading the container; ensure the total weight does not exceed the container’s capacity.

    3 containers of 20-ton middle size excavators ship out in March 5

предыдущий
Our Latest Export Range of Specialized Vehicles-Dump truck,Trailer, truck head
Компания Shanghai Chidi Trade проводит мероприятие по командообразованию и обучению для поощрения сотрудничества и профессионального роста
следующий
Рекомендуется для вас
нет данных
Связаться с нами
Copyright © 2025 Шанхайская международная торговая компания Chidi, Ltd. shchidi.com | Карта сайта   | Политика конфиденциальности 
Customer service
detect